|
BIMBomb™
The Security and Force Protection Add On to OPS™
What you can do with BIMBomb™
- If we can calculate how buildings are created we can also
calculate how they are pulled apart.
- An add on to the OPS™ to simulate the results of
an explosion on an OPS™ BIM.
- Add on to Archicad to simulate a more detailed analysis of
an explosion on a desktop BIM.
- Place location aware bombs that then interact with the
building and graphically show results.
- Rapid scenario based planning to make force protection
decisions.
- Common operational picture of the risks and threats of
design decisions.
Architects often point to BIM (Building Information Modeling)
as the
difference between 20th and 21st Century practice. In reality, it is
the change in design processes demanded by an evolving society that
will truly define the architect of this century. The early sharing of
critical information and allowing it's presentation to an increasingly
wide audience is what makes the BIMbomb™ a new phenomenon not
the
underlying technology.
BIMBomb add on in Archicad demonstrates graphically
the result of a blast on a BIM
The BIMBomb™ makes it possible to visually present
information. An
owner wants to quickly understand a bomb's impact on a facility. The
creation of a complex models such as the BIMbomb™ helps in
threat
assessment allowing clients to gain a more sophisticated understanding
of what impacts their mission.
2008-04-17 05:00:35 |