BUILDING PLAN |
(73_165) Lenfant Wing C |
|
|
|
|
|
Time: |
|
|
|
Occupied |
|
<70% |
|
Between 70% and 100% |
|
> 100% |
|
Unoccupied |
|
|
Damaged or failing |
|
Beyond Expected Useful Life |
|
|
BUILDING INFORMATION |
Building Information |
Building ID |
(B73_165) |
Building Name |
Lenfant Wing C |
Live Link |
Building in Onuma System |
Building Number |
TBD |
Total Estimated Building Cost |
$68,219,896 |
|
|
Building Areas |
# of Floors |
6 |
Net Calculated (=modelled spaces) |
142,831 sqft |
Gross Calculated |
160,587 sqft |
Rentable (calc. space types) |
127,914 sqft |
Assignable (calc. space types) |
70,276 sqft |
|
|
Building Occupancy |
Capacity (aggregated from space attributes) |
568 |
Occupancy (aggregated from space attributes) |
590 |
|
|
OPERATION & MAINTAINENCE |
O & M Cost Summary |
Custodial |
$396,649 |
Energy |
$457,672 |
Grounds |
$40,147 |
M&R |
$456,066 |
Management |
$383,802 |
Pest Control |
$20,876 |
Refuse |
$12,847 |
Road Clearance |
$1,606 |
Security |
$78,687 |
Telecom |
$40,147 |
Water / Sewer |
$62,629 |
Total Annual Cost |
$1,931,857 |
|
|
UTILITIES SUMMARY |
Utilities Summary |
Electricity Use(kWh / Year) |
3,372,319 |
Energy Use (kBTU/Year) |
14,452,795 |
Steam (MLB/Year) |
3,212 |
Water (Gal/Year) |
3,211,732 |
Natural Gas (CUFT/Year) |
80,293 |
Waste Water (Gal/Year) |
2,408,799 |
Solid Waste (Lbs/Year) |
14,453 |
|
|
LIVE CHARTS |
Space Utilization
|
Space Utilization
|
Enlarge
|
Departments
|
Departments
|
Enlarge
|
 |
Floor Finish
|
Floor Finish
|
Enlarge
|
 |
Energy Use
|
Energy Use
|
Enlarge
|
 |
Hours of Operation
|
Hours of Operation
|
Enlarge
|
 |
Ceiling Type
|
Ceiling Type
|
Enlarge
|
 |
Wall Finish
|
Wall Finish
|
Enlarge
|
 |
Wainscot
|
Wainscot
|
Enlarge
|
 |
Natural Lighting Levels
|
Natural Lighting Levels
|
Enlarge
|
 |
Floor Load Pounds PSF
|
Floor Load Pounds PSF
|
Enlarge
|
 |
Noise Criteria
|
Noise Criteria
|
Enlarge
|
 |
Room Pressure
|
Room Pressure
|
Enlarge
|
 |
Air Changes per Hour
|
Air Changes per Hour
|
Enlarge
|
 |
Room Name (type)
|
Room Name (type)
|
Enlarge
|
 |
Project Category
|
Project Category
|
Enlarge
|
 |
Target Temperature
|
Target Temperature
|
Enlarge
|
 |
Phasing
|
Phasing
|
Enlarge
|
 |
Occupancy Sensor
|
Occupancy Sensor
|
Enlarge
|
 |
Scheduling of Lighting
|
Scheduling of Lighting
|
Enlarge
|
 |
Temperature Current
|
Temperature Current
|
Enlarge
|
 |
Tenant Zones
|
Tenant Zones
|
Enlarge
|
 |
Green Standard IPD
|
Green Standard IPD
|
Enlarge
|
 |
|
|